Monitoring system for railway vehicle

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11173932
APP PUB NO 20190270464A1
SERIAL NO

16291544

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Provided is a monitoring system that can find abnormality in a device that supports a vehicle body of a railway vehicle during running at an early stage. The monitoring system for the railway vehicle includes a detector and a determiner. The detector detects a pressure A1 of a first air spring, a pressure A2 of a second air spring, a pressure A3 of a third air spring, and a pressure A4 of a fourth air spring of the railway vehicle during running. The first, second, third, and fourth air springs are respectively disposed on right front, left front, right rear, and left rear sides in a running direction of the railway vehicle. The determiner determines abnormality from a relation between a magnitude of diagonal imbalance P obtained from a formula (1) or (2) below and a mileage or elapsed time of the railway vehicle.

description='In-line Formulae' end='lead'P=(A1−A2)−(A3−A4)  (1)description='In-line Formulae' end='tail'

description='In-line Formulae' end='lead'P=(A3−A4)−(A1−A2)  (2)description='In-line Formulae' end='tail'

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CENTRAL JAPAN RAILWAY COMPANY1-4 MEIEKI 1-CHOME NAKAMURA-KU NAGOYA-SHI AICHI 450-6101

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ebina, Suetaka Nagoya, JP 1 0
Kita, Shigemitsu Nagoya, JP 1 0
Kobayashi, Gakuji Nagoya, JP 4 3
Nishimura, Kazuhiko Nagoya, JP 29 577

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 May 16, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 May 16, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 16, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00