In-line connector assembly for connecting first and second sections of a mm-wave waveguide, where the connector assembly includes a connector body having a periodic array of conductive elements

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10777864
APP PUB NO 20190252746A1
SERIAL NO

16299154

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A networking system includes a transmitter, a waveguide and a receiver. The transmitter is configured to generate a millimeter-wave signal carrying data. The waveguide is transmissive at millimeter-wave frequencies and is configured to receive the millimeter-wave signal from the transmitter, and to guide the millimeter-wave signal from the transmitter to a downstream location by having a dielectric constant that varies over a transversal cross-section of the waveguide in accordance with a predefined profile. The receiver is configured to receive the millimeter-wave signal guided by the waveguide, and to extract the data carried by the received millimeter-wave signal.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MARVELL ASIA PTE LTDSINGAPORE

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Tam, Sai-Wang Sunnyvale, US 22 149
Wong, Alden C Sunnyvale, US 12 14

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 15, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 15, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00