Conduit segment casting mold and method of forming a conduit segment

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10913178
APP PUB NO 20190249552A1
SERIAL NO

16208185

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A conduit segment casting mold system includes at least one inner mold; at least one outer mold configured as at least two outer mold sections of opposed shapes that define a cavity between the at least two outer mold sections that is sized to at least partially enclose the at least one inner mold, each of the at least two outer mold sections including a respective mating surface, each of the at least two outer mold sections including at least one hole sized to receive a cable, and the at least one hole of a particular one of the at least two outer mold sections is aligned with the at least one hole of another particular one of the at least two outer mold sections when the mating surfaces of the particular one and the another particular one of the at least two outer mold sections are mated; and a mold base.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ELECTRICWAZE LLC1700 SHALLCROSS AVENUE SUITE 1 WILMINGTON DE 19806

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Tessien, Ross Grass Valley, US 12 79

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 9, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 9, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00