Ignition control device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10704522
APP PUB NO 20190242353A1
SERIAL NO

16386352

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An ignition control device includes a main ignition circuit to generate a spark discharge to a spark plug by controlling energization of a primary coil of an ignition coil for an internal combustion engine, an energy supply circuit that supplies energy based on a discharge continuation signal by controlling the energization of the primary coil during the spark discharge started by the operation of the main ignition circuit to supply a secondary current in the same direction as a main ignition continuously in a secondary coil of the ignition coil, a secondary current command circuit for outputting a command value of the secondary current based on the secondary current command signal, and an ignition control unit for setting signal values of the secondary current command signal and the discharge continuation signal.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
DENSO CORPORATION1-1 SHOWA-CHO KARIYA-CITY AICHI-PREF 448-8661

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Morita, Hisaharu Kariya, JP 9 55
Niwa, Mitsunobu Kariya, JP 14 133
Takeda, Shunichi Kariya, JP 32 149

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 7, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 7, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00