Manually guided implement

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10953533
APP PUB NO 20190240827A1
SERIAL NO

16269259

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A manually guided implement possesses a guide tube, wherein a first mass body is disposed on a first end of the guide tube, and a second mass body is disposed on a second end of the guide tube. One of the mass bodies has a housing, and the other of the mass bodies has a tool driven by a drive motor. A power transmission mechanism for driving the tool between the first and second ends of the guide tube is guided in the interior of the guide tube. A first antivibration element is disposed between the first end of the guide tube and the first mass body. The guide tube in the direction of the longitudinal central axis thereof includes a first rigid sub-portion and a second rigid sub-portion that are connected to one another at an abutment location by at least one second antivibration element.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ANDREAS STIHL AG & CO KG71336 WAIBLINGEN

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Menzel, Johannes Wernau/Neckar, DE 115 667
Pelludat, Simone Schorndorf, DE 2 12
Schmid, Marc Oppenweiler, DE 20 109
Siam, Samir Stuttgart, DE 1 3
Wörner, Tobias Korb, DE 2 5

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 23, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 23, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00