Multi-stage sub-THz frequency generator incorporating injection locking

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10862423
APP PUB NO 20190229675A1
SERIAL NO

16256231

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A novel and useful mm-wave frequency generation system is disclosed that takes advantage of injection locking techniques to generate an output oscillator signal with improved phase noise (PN) performance and power efficiency. Low frequency and high frequency DCOs as well as a pulse generator make up the oscillator system. A fundamental low frequency (e.g., 30 GHz) signal and its sufficiently strong higher (e.g., fifth) harmonic (e.g., 150 GHz) are generated simultaneously in a single oscillator system. The second high frequency DCO having normally poor phase noise is injected locked to the first low frequency DCO having good phase noise. Due to injection locking, the high frequency output signal generated by the second DCO exhibits good phase noise since the phase noise of the second DCO tracks that of the first DCO.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
UNIVERSITY COLLEGE DUBLINBELFIELD 4 DUBLIN

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bozorg, Amirhossein Ansari Dublin, IE 4 4
Staszewski, Robert Bogdan Dublin, IE 143 1444

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 8, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 8, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00