Quartz crystal resonator, quartz crystal unit, and quartz crystal oscillator

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11563406
APP PUB NO 20190222174A1
SERIAL NO

16265444

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A quartz crystal unit comprising a quartz crystal resonator having a base portion, and first and second tuning fork arms connected to the base portion, the base portion having a length less than 0.5 mm and greater than a spaced-apart distance between the first and second tuning fork arms, each of the first and second tuning fork arms having a width less than 0.1 mm and a length less than 1.56 mm, and a plurality of different widths including a first width and a second width greater than the first width, at least one groove being formed in at least one of opposite main surfaces of each of the first and second tuning fork arms so that a length of the at least one groove is within a range of 0.3 mm to 0.79 mm, the quartz crystal resonator being housed in a case, and a lid being connected to the case.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
PIEDEK TECHNICAL LABORATORY1-44-1 KAMITAKADA NAKANO-KU 164-0002

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kawashima, Hirofumi Tokyo, JP 70 741

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jul 24, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 24, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 24, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00