Combined glasses structure, frameless glasses, half-frame glasses and full-frame glasses

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10996487
APP PUB NO 20190219837A1
SERIAL NO

16068907

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A combined glasses structure, including a lens component, two temples, a frame component and a nose pad component is provided. The lens component comprises two lens and a bridge, two temples are respectively detachably connected to the lens component; the frame component includes an upper frame and a lower frame, the upper frame and lower frame are respectively detachably arranged on an upper and a lower edge of the lens component; the nose pad component and the bridge are detachably connected to each other, and can restrict and fix the upper frame and/or lower frame arranged on the upper edge, lower edge, upper and lower edges of the two lens. By the detachable connection between the frame component and the lens, the frameless, half-frame (upper frame or lower frame) and full-frame functions of the combined glasses can be achieved.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
XIAMEN YARUI OPTICAL CO LTDXIAMEN FUJIAN 361000

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Lin, Zheyu Fujian, CN 2 15
Shangguan, Qunyan Fujian, CN 2 15

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Nov 4, 2024
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 4, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 4, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00