Integrated damper control system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11480334
APP PUB NO 20190219262A1
SERIAL NO

16363016

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A damper control device may include an appliance control programmed processor for controlling a gas burner, the appliance control programmed processor including a lockout register for storing electronic data information, and a damper control programmed processor for controlling a damper, the damper control programmed processor including a damper request register for storing electronic data information. The damper control programmed processor may be configured for selectively opening or closing the damper responsive to status of the damper request register and controlling status of the lockout register to indicate status of the damper, and the appliance control programmed processor may be configured for controlling status of the damper request register responsive to a call for operation of the gas burner and operating the gas burner only if the lockout register is in an unlock status.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
FIELD CONTROLS L L C2630 AIRPORT ROAD KINSTON NC 28504

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hokanson, Eric A Kinston, US 6 5

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Apr 25, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 25, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 25, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00