Francis turbine and method of operating same
Number of patents in Portfolio can not be more than 2000
United States of America Patent
Stats
-
Jun 8, 2021
Grant Date -
Jul 18, 2019
app pub date -
Jun 14, 2017
filing date -
Aug 8, 2016
priority date (Note) -
In Force
status (Latency Note)
![]() |
A preliminary load of PAIR data current through [] has been loaded. Any more recent PAIR data will be loaded within twenty-four hours. |
PAIR data current through []
A preliminary load of cached data will be loaded soon.
Any more recent PAIR data will be loaded within twenty-four hours.
![]() |
Next PAIR Update Scheduled on [ ] |

Importance

US Family Size
|
Non-US Coverage
|
Abstract
A Francis turbine includes a waterway, an impeller disposed in the waterway, a distributor apparatus disposed in the waterway and an additional element for adjusting the flow of water through the turbine. The additional element is disposed in the waterway upstream of the impeller in the water flow direction, and the additional element includes a perforated metal sheet that may be brought into the waterway. A method for operating such a turbine is also provided.
First Claim
all claims..Other Claims data not available
Family

- 15 United States
- 10 France
- 8 Japan
- 7 China
- 5 Korea
- 2 Other
Patent Owner(s)
Patent Owner | Address | |
---|---|---|
VOITH PATENT GMBH | ST POELTENER STRASSE 43 HEIDENHEIM D-89522 |
International Classification(s)

- 2017 Application Filing Year
- F03B Class
- 257 Applications Filed
- 163 Patents Issued To-Date
- 63.43 % Issued To-Date
Inventor(s)
Inventor Name | Address | # of filed Patents | Total Citations |
---|---|---|---|
Mende, Carsten | Herbrechtingen, DE | 1 | 0 |
# of filed Patents : 1 Total Citations : 0 | |||
Neidhardt, Thomas | Heidenheim, DE | 5 | 16 |
# of filed Patents : 5 Total Citations : 16 |
Cited Art Landscape
- No Cited Art to Display

Patent Citation Ranking
- 0 Citation Count
- F03B Class
- 0 % this patent is cited more than
- 4 Age
Forward Cite Landscape
- No Forward Cites to Display

Maintenance Fees
Fee | Large entity fee | small entity fee | micro entity fee | due date |
---|---|---|---|---|
3.5 Year Payment | $1600.00 | $800.00 | $400.00 | Dec 8, 2024 |
7.5 Year Payment | $3600.00 | $1800.00 | $900.00 | Dec 8, 2028 |
11.5 Year Payment | $7400.00 | $3700.00 | $1850.00 | Dec 8, 2032 |
Fee | Large entity fee | small entity fee | micro entity fee |
---|---|---|---|
Surcharge - 3.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge - 7.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge - 11.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge after expiration - Late payment is unavoidable | $700.00 | $350.00 | $175.00 |
Surcharge after expiration - Late payment is unintentional | $1,640.00 | $820.00 | $410.00 |
Full Text

Legal Events
- No Legal Status data available.

Matter Detail

Renewals Detail
