Bicycle and tire structure

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11420473
APP PUB NO 20190217664A1
SERIAL NO

16244087

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A tire structure disposed at a rim is provided. The tire structure includes a tire body, a flexible sealing member and a nozzle. The tire body is ring-shaped and includes a groove and two beads. The flexible sealing member is connected to the tire body to form an inflating space with the groove, and the flexible sealing member includes a through hole. The nozzle is disposed at the flexible sealing member. The nozzle includes a base and a valve stem. The base includes a screw hole and is disposed at a far side of the flexible sealing member. The screw hole corresponds to the through hole. The valve stem includes a fastening end and an inflating channel. The fastening end is configured to insert into the screw hole, and the inflating channel is configured to allow the gas to pass therethrough.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
GIANT MANUFACTURING CO LTDNO 999 SEC 1 DONGDA RD XITUN DIST TAICHUNG CITY 407

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hsu, Che-Wei New Taipei, TW 157 549
Tseng, Wei-Han Hsinchu, TW 5 29

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Feb 23, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 23, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 23, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00