Scheduling of data transmission from internet of things user equipment to a base station of a cellular network

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10764907
APP PUB NO 20190208528A1
SERIAL NO

15859089

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Data transmissions are scheduled from internet of things (IoT) user equipment (UEs) to a base station (BS) that serves those IoT UEs in a cellular network. A BS may broadcast synchronization information to the IoT UEs that allows the BS to calculate and use a schedule for receiving data transmissions from the UEs. This information can include a total number of the IoT UEs being serviced, a length of a spreading code to use in the schedule, a time domain periodicity of available resources, and a maximum number of the IoT UEs that can send data to the BS at one time. Each IoT UE can independently apply a mathematical operation to the broadcast information it receives to calculate and use the schedule. The BS can receive the data transmissions from each of the IoT UEs according to that schedule.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
FUTUREWEI TECHNOLOGIES INC5340 LEGACY DRIVE SUITE 175 PLANO TX 75024

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ravindran, Ravishankar San Ramon, US 75 3631
Sagari, Shweta San Jose, US 5 32

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 1, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 1, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00