Composite end plate and battery module

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10944141
APP PUB NO 20190207194A1
SERIAL NO

16225958

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The disclosure relates to a composite end plate and a battery module. The composite end plate comprises an end plate body and a rigid connecting plate. The end plate body comprises a first surface and a second surface disposed opposite to each other in its thickness direction, a first connecting segment, an intermediate transitional segment and a second connecting segment disposed successively in its width direction. The rigid connecting plate and the end plate body are made of different materials. The rigid connecting plate is disposed at the intermediate transitional segment, and comprises a transferring segment and a connecting arm embedded into the intermediate transitional segment such that the rigid connecting plate and the end plate body are fixedly connected. The transferring segment is located at the second surface. A surface of the transferring segment away from the intermediate transitional segment can be fixedly connected to an external structural component.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CONTEMPORARY AMPEREX TECHNOLOGY (HONG KONG) LIMITED13/F LKF29 29 WYNDHAM STREET CENTRAL HONG KONG

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Cao, Gen Ningde, CN 18 32
Liu, Wenwen Ningde, CN 21 107
Yao, Jihua Ningde, CN 41 35

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 9, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 9, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00