Turboprop engine assembly with combined engine and cooling exhaust

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10927734
APP PUB NO 20190203620A1
SERIAL NO

16292846

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A turboprop engine assembly for an aircraft, including an internal combustion engine having a liquid coolant system, an air duct in fluid communication with an environment of the aircraft, a heat exchanger received within the air duct having coolant passages in fluid communication with the liquid coolant system and air passages air passages in fluid communication with the air duct, and an exhaust duct in fluid communication with an exhaust of the internal combustion engine. The exhaust duct has an outlet positioned within the air duct downstream of the heat exchanger and upstream of an outlet of the air duct, the outlet of the exhaust duct spaced inwardly from a peripheral wall of the air duct. In use, a flow of cooling air surrounds a flow of exhaust gases. A method of discharging air and exhaust gases in an turboprop engine assembly having an internal combustion engine is also discussed.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
PRATT & WHITNEY CANADA CORP1000 MARIE VICTORIN BLVD LONGUEUIL QU J4G 1A1

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Dussault, Serge Ste-Julie, CA 31 136
Julien, Andre Ste-Julie, CA 81 615
Thomassin, Jean Ste-Julie, CA 130 1270

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 23, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 23, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00