Substrate support unit and deposition apparatus including the same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11098406
APP PUB NO 20190203353A1
SERIAL NO

16043255

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A substrate support unit according to an example embodiment of the present inventive concept may include a support having an upper surface on which a substrate is disposed; a coupling ring on which an edge of the substrate is disposed, the coupling ring being having an annular shape, wherein the coupling ring is disposed on an edge of the support; and an arm part for raising and lowering the coupling ring and the substrate, wherein the arm part is disposed below the coupling ring and under a portion of the coupling ring, wherein the coupling ring has a first region disposed on the arm part and a second region disposed around the first region, wherein the first region has a thickness greater than that of the second region.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SAMSUNG ELECTRONICS CO LTDGYEONGGI DO SOUTH KOREA GYEONGGI-DO

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Im, Ji Woon Hwaseong-si, KR 10 23
Jeon, Il Jun Hwaseong-si, KR 2 3
Lee, Je Hak Hwaseong-si, KR 1 3
Lee, Jun Sung Suwon-si, KR 31 240
Uh, Ji Ho Seoul, KR 6 11

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Feb 24, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 24, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 24, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00