Articulated vehicle having a passage with a noise insulating layer

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11407433
APP PUB NO 20190202482A1
SERIAL NO

16322739

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The invention relates to an articulated vehicle including a plurality of vehicles or vehicle parts connected to one another in an articulated manner, a passage arranged between adjacent ones of the vehicles or the vehicle parts, the passage having an inner lining and an outer lining laterally spaced from the inner lining so as to define an empty cavity therebetween, one front wall on each side of the passage between the two adjacent vehicles or vehicle parts, the inner lining and the outer lining being arranged at the front walls of the two adjacent vehicles or vehicle parts while forming the empty cavity therebetween, a noise-absorbing noise insulation layer applied to a free surface on each of the front walls in the empty cavity between the inner and outer lining, wherein each of the noise-absorbing noise insulation layer extends into the empty cavity and terminates at a surface facing opposite to the each of the front walls respectively.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HÜBNER GMBH & CO KG34123 KASSEL

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kunze, Andreas Melsungen, DE 5 7

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Feb 9, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 9, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 9, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00