System for optimizing a trailer path

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10919350
APP PUB NO 20190202251A1
SERIAL NO

16240707

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The invention is a system for optimizing a trailer path. The system includes an image sensor configured to capture images of a trailer attached to a tow vehicle, accelerometers that sense acceleration of at least one of the tow vehicle and the trailer, a data input device configured to receive input data, and a processing device. The processing device includes a processor and non-volatile memory. The processor is configured to receive image data from the image sensor, receive accelerometer data from the one or more accelerometers and receive the input data from the data input device. Additionally, the processor is configured to determine a trailer path based on the image data, accelerometer data, and the input data. The processor is also configured to communicate the trailer path to a user or vehicle control system, thereby prompting adjustments to the tow vehicle path and or acceleration when the trailer path is not optimum.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HALL LOGIC INC3000 SIERRA VISTA WAY PROVO UT 84606

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hall, David R Provo, US 1292 20766
Hall, Michael Provo, US 291 2970
Myer, Seth Eagle Mountain, US 48 218

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 16, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 16, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00