Easy loading toy projectile launcher

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10648767
APP PUB NO 20190195593A1
SERIAL NO

15991683

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A toy projectile launcher for launching projectiles, e.g, toy foam darts, from a hopper. One or more agitating members inside the hopper to enable the projectiles to drop into a firing chamber under the hopper. A hopper cover has a collapsible ceiling with nested members and a ceiling plate to maintain the projectiles toward the bottom of the hopper. A catch coupled to the ceiling plate engages an opening in a hopper wall to prevent the ceiling from collapsing when the hopper cover is closed. Where there are multiple vertically spaced-apart openings in the hopper wall, the catch may disengage from a first opening, and then engage a lower, second opening in the hopper wall, as the number of projectiles in the hopper drops and the ceiling plate descends in the hopper. A rotating track and a push rod advance projectiles from the firing chamber to flywheels for launch.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
EASEBON SERVICES LIMITED151 HOI BUN ROAD STE 5 2/F KWONG SANG HONG CENTRE KWUN TONG

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chia, Francis See Chong Kowloon, HK 63 401
Huebl, Steven J Jordon, US 16 200

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 12, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 12, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00