Control device of internal combustion engine

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10876500
APP PUB NO 20190195173A1
SERIAL NO

16173062

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A control device of an internal combustion engine using a neural network, wherein an output value obtained by experiments is made training data for a value of an operating parameter of the engine in a presumed usable range, while an output value obtained by prediction without relying on experiments is made training data for a value of the operating parameter of the engine outside of the presumed usable range. The training data obtained by experiments and the training data obtained by prediction are used to learn the weights and the biases of the neural network so that an output value which changes in accordance with a value of an operating parameter of the engine matches the training data, and thereby even outside of the presumed usable range of the operating parameter, the output value can be suitably estimated.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TOYOTA JIDOSHA KABUSHIKI KAISHA1 TOYOTA-CHO TOYOTA-SHI AICHI-KEN 471-8571

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ehara, Masato Gotemba, JP 47 139
Kitagawa, Eiki Susono, JP 28 89

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 29, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 29, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00