Staged fuel burner with jet induced exhaust gas recycle

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10451271
APP PUB NO 20190186731A1
SERIAL NO

15849354

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The pre-mix burner assembly includes a jet pump comprising a combustion air tube, a flue gas inlet, and a suction chamber. The combustion air tube has an inlet and a tapered nozzle, and it is connected to a combustion gas fan. The flue gas inlet is connected to the suction chamber and the furnace chamber or other flue gas source. The suction chamber surrounds the combustion air tube, and it has a jet pump nozzle with a discharge. The combustion air exiting the combustion air nozzle creates a negative pressure in the suction chamber and draws flue gas into the suction chamber. There is a burner housing positioned downstream of the jet pump discharge. There is a fuel gas inlet connected to a mixing tube in the burner housing, and a burner block connected to the outlet of the burner housing.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HONEYWELL INTERNATIONAL INCINTELLECTUAL PROPERTY SERVICES GROUP 855 S MINT STREET CHARLOTTE NC 28202

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Patterson, Bradley D Dunkirk, US 4 18
Perdue, Jayson New Castle, US 5 5
Scholler, Marek Olomoucky kraj, CZ 4 13
Taylor, Curtis L Fishers, US 21 246

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 22, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 22, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00