Turbo pump vent assembly and method

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11149736
APP PUB NO 20190186494A1
SERIAL NO

16325623

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A turbo pump vent assembly and method are disclosed. The turbo pump vent assembly comprises: a primary manual actuator operable to deliver an initial volume of air to a turbo pump; and a secondary manual actuator operable to deliver a secondary volume of air to the turbo pump, wherein the secondary volume of air is greater than the initial volume of air. In this way, an uncomplex and reliable vent is provided which can deliver initial volumes of air to slow the turbo pump initially. Thereafter, the secondary volume of air may be delivered to slow the turbo pump more rapidly than is possible just using further initial volumes of air. Having an apparatus which can deliver differing volumes of air enables the turbo pump to be slowed safely and more quickly than is possible by delivering just the same sized volumes of air.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
EDWARDS LIMITEDBURGESS HILL

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Miles, Christopher Burgess Hill, GB 19 344

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Apr 19, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 19, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 19, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00