Furnace wall, gasification unit and integrated gasification combined cycle, and method of manufacturing furnace wall

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10954853
APP PUB NO 20190186358A1
SERIAL NO

16311295

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The purpose of the present invention is to provide a furnace wall in which a throat section with a smaller channel diameter than other regions can be formed using all peripheral wall tubes. Provided is a furnace wall comprising: a plurality of peripheral wall tubes (142), which are disposed so as to form a cylindrical shape when aligned in one direction and through the interior of which cooling water flows; and fins (140) that connect neighboring peripheral wall tubes (142) in an airtight manner. In a throat section in which the diameter of a horizontal cross-section of the cylindrical shape is reduced in comparison to other regions, the peripheral wall tubes (142) are disposed so as to be in mutual contact and the fins (140) are disposed on the inner circumferential sides of the cylindrical shapes.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MITSUBISHI POWER LTD2-3 MARUNOUCHI 3-CHOME CHIYODA-KU TOKYO 1008332 ?1008332

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chuman, Fumihiro Yokohama, JP 7 5
Kitada, Masashi Yokohama, JP 25 71
Toyomaru, Makoto Yokohama, JP 3 1

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 23, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 23, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00