Hydroxide stabilization as a means of controlling surface fouling associated with wetted surfaces of boats barges and ships

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10800497
APP PUB NO 20190185117A1
SERIAL NO

16145906

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The invention is an immersion system for decontamination of ship outer surfaces while a ship is located in a lock structure. The lock structure is modified with an inflatable bladder and shortened containment gates. When the ship enters or exits the lock structure, the inflatable bladder is deflated before opening the containment gates. When the inflatable bladder is deflated, a lower treated fluid layer sinks and water adjacent to the lock structure enters the lock through wall ports to create an upper fluid layer on which the ship enters. When the ship is located in the lock structure and the containment gates are closed, the inflatable bladder is inflated. When the inflatable bladder is inflated, the lower treated fluid layer rises and surrounds the ship surface to kill invasive aquatic species.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
U S GEOLOGICAL SURVEYRESTON VA

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Watten, Barnaby Jude Winchester, US 10 49

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 13, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 13, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00