Hybrid vehicle

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10919516
APP PUB NO 20190184965A1
SERIAL NO

16214514

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Calculated Rating
US Family Size
Non-US Coverage

Abstract

See full text

When the state of charge of a power storage device is equal to or higher than a predetermined ratio in a specific acceleration time where an acceleration request is equal to or greater than a predetermined level, a hybrid vehicle controls an engine such that the rotation speed of the engine is not increased in a range of an output limit of the power storage device and that the engine is operated at an operation point on a fuel consumption priority operation line. When the state of charge of the power storage device is lower than the predetermined ratio in the specific acceleration time, the hybrid vehicle controls the engine such that the rotation speed of the engine is not increased in the range of the output limit of the power storage device and that the engine is operated at an operation point on a power priority operation line.

First Claim

See full text

Other Claims data not available

Family

PCTEP
+

Patent Owner(s)

Patent OwnerAddress
TOYOTA JIDOSHA KABUSHIKI KAISHAAICHI

International Classification(s)

loading....
  • 2018 Application Filing Year
  • B60K Class
  • 2941 Applications Filed
  • 2167 Patents Issued To-Date
  • 73.69 % Issued To-Date
Click to zoom InYear of Issuance% of Matters IssuedCumulative IssuancesYearly Issuances201820192020202120222023202420250255075100

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kamatani, Hideki Toyota, JP 36 133

Cited Art Landscape

Load Citation

Patent Citation Ranking

  • 0 Citation Count
  • B60K Class
  • 0 % this patent is cited more than
  • 4 Age
Citation count rangeNumber of patents cited in rangeNumber of patents cited in various citation count ranges5485261614101 - 1011 - 2031 - 4051 - 6061 - 700255075100125150175200225250275300325350375400425450475500525550575600

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 16, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 16, 2032