Method for manufacturing bicycle crank

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10625815
APP PUB NO 20190176929A1
SERIAL NO

15835875

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for manufacturing a bicycle crank is revealed. After being extended, bent and forged, an aluminum alloy pipe becomes an L-shaped part formed by a cylindrical crankshaft portion and an oval crank portion integrally connected to each other. A plug is inserted into an outer end of the crank portion while a periphery of an outer end of the crankshaft portion is punched to form a shaft-connecting portion. An assembling hole is arranged at the outer end of the crank portion, corresponding to the plug. Thus a bicycle crank is produced. Thereby not only the assembly of the bicycle crank is easier and more convenient, the structural strength of the bicycle crank is increased effectively to against vibrations and impacts. The bicycle is lightweight and the bicycle crank is more streamlined so that consumers are attracted. Thereby the market competitiveness is increased.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ALEX GLOBAL TECHNOLOGY INCTAINAN CITY

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chen, Wei-Chin Tainan, TW 61 126

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 21, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 21, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00