Multistage drying apparatus and multistage drying method for sheet material to be treated

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11000966
APP PUB NO 20190176359A1
SERIAL NO

16323760

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A horizontal multistage press apparatus 1 (multistage drying apparatus) includes conveyance paths R1 to R4 (first to fourth conveyance paths) in which the veneer sheet W1 (sheet material to be treated) is carried out in a standing state. The conveyance path R1 is positioned over between the loader device 10 and the hot press device 20, the conveyance path R2 is positioned over between the hot press device 20 and the open transpiration device 40, the conveyance path R3 is positioned over between the open transpiration device 40 and the temperature control press device 50, and the conveyance path R4 is positioned over between the temperature control press device 50 and the unloader device 60. The conveyance paths R1 to R4 are arranged in a straight line in plan view.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TAIHEI MACHINERY WORKS LTDKOMAKI-SHI AICHI

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Aoyama, Kazuya Aichi, JP 2 1
Ishiguro, Masaru Aichi, JP 2 1
Kato, Wataru Aichi, JP 27 124
Mizutani, Keisuke Aichi, JP 20 18
Sato, Noriyuki Aichi, JP 188 791

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Nov 11, 2024
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 11, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 11, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00