System for oxidant intake

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10697637
APP PUB NO 20190154261A1
SERIAL NO

15820739

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A gas turbine system includes a plenum that includes an inlet and an outlet. The inlet is configured to receive a flow of oxidant and the outlet is configured to direct the flow of oxidant in a downstream direction. Additionally, a support system is coupled to the plenum and to a cone. The support system enables the cone to move along the support system from a first position to a second position. The cone includes an upstream end and the upstream end is removably coupled to the outlet of the plenum in the first position. When the cone is in the first position, the cone is configured to direct the flow of oxidant in the downstream direction to a gas turbine engine. The upstream end is disposed upstream of the outlet and is decoupled from the outlet when the cone is in the second position.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
GE INFRASTRUCTURE TECHNOLOGY LLC300 GARLINGTON ROAD GREENVILLE SC 29615

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Christensen, Timothy Martin Baytown, US 2 11
Laing, Donald Gordon Glasgow, GB 16 962
Lopez, Moctezuma Yalid Mariluz Queretaro, MX 1 3
Plata, Gerardo Queretaro, MX 3 133
Ponnuraj, Balakrishnan Sugar Land, US 15 54
Yerram, Ravinder Sugar Land, US 11 20

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 30, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 30, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00