Coordinated actuation to start an engine

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10815951
APP PUB NO 20190153987A1
SERIAL NO

15818863

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A vehicle includes an engine and an electric machine coupled to a transmission element. The electric machine is also selectively coupled with the engine by a clutch. The vehicle includes a belt integrated starter-generator (BISG) operatively coupled to the engine. An electronic controller includes one or more inputs adapted to receive a temperature measurement and a request to start the engine. The electronic controller is programmed to energize the BISG and the electric machine in response to receiving an engine start request and a temperature measurement being less than a threshold temperature measurement. The electronic controller is further programmed to close the disconnect clutch to apply torque from the electric machine to the engine in response to the electric machine achieving a threshold electric machine speed.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
FORD GLOBAL TECHNOLOGIES LLCDEARBORN MICHIGAN USA DEARBORN MICHIGAN

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Connolly, Francis Thomas Ann Arbor, US 48 351
Thompson, Scott James Canton, US 38 237

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 27, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 27, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00