System and method of producing foamed cement in a laboratory environment

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11192072
APP PUB NO 20190134573A1
SERIAL NO

16094182

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Systems and methods related to preparing foamed cement for laboratory analysis are provided. A prepared cement slurry is placed in a cement reservoir cell configured to pressurize the cement slurry contained within the cement reservoir cell to a capture pressure. After pressurization, the cement slurry and a compressed gas are introduced into a foam generator. Foamed cement generated in the foam generator is introduced from the tee into a foam capture cell where it can cure prior to analysis.

First Claim

See full text

Other Claims data not available

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HALLIBURTON ENERGY SERVICES INC3000 N SAM HOUSTON PARKWAY E SUITE 2800 HOUSTON TX 77032-3219

International Classification(s)

loading....
  • 2016 Application Filing Year
  • C09K Class
  • 3076 Applications Filed
  • 2094 Patents Issued To-Date
  • 68.08 % Issued To-Date
Click to zoom InYear of Issuance% of Matters IssuedCumulative IssuancesYearly Issuances20162017201820192020202120222023202420250255075100

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Jimenez, Walmy Cuello Houston, US 24 155
Maxson, Joe Kleber Porter, US 2 1
Morgan, Ronnie Glen Waurika, US 58 652
Pang, Xueyu Tomball, US 24 91
Prince, Aaron Cade Plain City, US 2 1
Singh, John P Kingwood, US 18 75
Sodhi, Thomas Singh New Caney, US 18 44

Cited Art Landscape

Load Citation

Patent Citation Ranking

  • 0 Citation Count
  • C09K Class
  • 0 % this patent is cited more than
  • 4 Age
Citation count rangeNumber of patents cited in rangeNumber of patents cited in various citation count ranges114261520201 - 1011 - 2021 - 3005010015020025030035040045050055060065070075080085090095010001050110011501200

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jun 7, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 7, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 7, 2033