Control device and method for turbocharged engine

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10731547
APP PUB NO 20190120128A1
SERIAL NO

16164354

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A smooth shift is achieved between an operating region in which a first turbocharger is mainly operated and an operating region in which a second turbocharger is mainly operated. A PCM controls a throttle valve to use a first supercharging region in which a gas flow through an exhaust bypass passage is reduced and a second supercharging region in which the gas flow through the exhaust bypass passage is promoted differently based on the operating state of an engine. In an early stage of a shift from the first supercharging region to the second supercharging region, the PCM executes bridge control to allow the flow velocity of exhaust gas flowing into a large turbine to be higher than at a point in time at which the shift starts.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MAZDA MOTOR CORPORATION3-1 SHINCHI FUCHU-CHO AKI-GUN HIROSHIMA 7308670 ?7308670

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Minamoto, Hiroshi Hiroshima, JP 11 113
Suzuki, Kenichiro Hiroshima, JP 83 628
Yunoki, Nobuo Aki-gun, JP 7 15

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 4, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 4, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00