Construction method for a building

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10760260
APP PUB NO 20190119900A1
SERIAL NO

15892627

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A construction method for a building is provided that includes the steps of: hoisting and positioning a plurality of precast columns on at least a portion of a predetermined area of a construction site to form a precast column array having at least two spans along a first direction and one or more spans along a second direction substantially perpendicular to the first direction; positioning the pre-fabricated beam rebar assemblies between adjacent precast columns, positioning each of the precast slab panels on support potions on the precast columns, assembling the beam cage and pouring the concrete into the molds for the beam cage to accomplish the structure of a single story; and repeating the steps of constructing the above-mentioned precast column array until completion of the structure of all stories of the building.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
RUENTEX ENGINEERING & CONSTRUCTION CO LTD10F NO 308 SEC 2 BADE ROAD JHONGSHAN DISTRICT TAIPEI CITY 104

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Shu, Kun-Jung Taipei, TW 9 16
Yin, Samuel Taipei, TW 41 94

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 1, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 1, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00