Apparatus and method for generating a high power energy beam based laser

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10680400
APP PUB NO 20190115713A1
SERIAL NO

15785022

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A system for generating an energy beam based laser includes an apparatus for receiving an energy beam and for generating an energy beam based laser. The apparatus is configurable or controllable for tuning an output wavelength of the laser generated by the apparatus using the energy beam. The apparatus includes a first component for producing a first magnetic field oriented in a first direction and a second component for producing a second magnetic field oriented in a second direction substantially opposite to the first direction. A channel through the apparatus is defined by the first component and the second component through which the energy beam passes to generate the laser at an output of the apparatus. The apparatus is configurable or controllable for modifying at least one of the first magnetic field and the second magnetic field for tuning the output wavelength of the laser.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
THE BOEING COMPANY929 LONG BRIDGE DRIVE ARLINGTON VA 22202

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Clemen,, Jr Mark Joseph Port Orchard, US 18 124
Hull, John R Sammamish, US 94 884

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 9, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 9, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00