Projectile launcher apparatus with magazine

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10648764
APP PUB NO 20190107358A1
SERIAL NO

16139073

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A toy launcher apparatus of a soft foam dart where the dart is loaded onto a spike in a firing chamber by a pusher panel that presses against the nose of the dart. The apparatus includes a dart magazine with a feed mechanism. The pusher panel is followed by a barrier sleeve that prevents the next uppermost dart in the magazine, which is being biased upward by the feed mechanism, from causing either the uppermost dart or the second uppermost dart to distort and cause a jam. The barrier sleeve also prevents the magazine from being loaded through a top opening until the uppermost dart in the firing chamber is launched. Near the end of a cocking cycle, the pusher panel, which is connected to a cam follower tab that engages a cam member, moves away from a launch path of the dart in the firing chamber.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HASBRO INC1027 NEWPORT AVENUE PAWTUCKET RI 02862

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hing, Tong Martin Leung Hong Kong, HK 1 16
Lallier, John Paul North Attleboro, US 5 79
Shing, Bun Alan Wong Hong Kong, HK 1 16
Spielberger, Lee Rumford, US 10 201
Wan, Yin Jack Tang Hong Kong, HK 1 16

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 12, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 12, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00