Gas turbine combustor flame holder

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10851998
APP PUB NO 20190107283A1
SERIAL NO

16087882

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A combustor includes: a first nozzle which extends along an axis and injects fuel toward a downstream side; a flame stabilizer which covers a downstream-side end portion of the first nozzle from an outer periphery side; and a plurality of second nozzles arranged at intervals in a circumferential direction around the axis on the outer periphery side of the flame stabilizer. The flame stabilizer has a cone portion expanding in diameter toward the downstream side from the upstream side, and a flange portion extending radially outward from a downstream-side end edge of the cone portion, and a penetrating portion which penetrates at least the flange portion in a direction of the axis is formed in the flame stabilizer.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MITSUBISHI POWER LTD2-3 MARUNOUCHI 3-CHOME CHIYODA-KU TOKYO 1008332 ?1008332

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Akamatsu, Shinji Yokohama, JP 52 355
Fukuba, Shinichi Tokyo, JP 8 10
Miyamoto, Kenji Tokyo, JP 161 980
Saito, Keijiro Tokyo, JP 41 223
Takiguchi, Satoshi Tokyo, JP 43 193

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 1, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 1, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00