Load based tire pressure regulation system and methods

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11072211
APP PUB NO 20190105952A1
SERIAL NO

16157627

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A load based tire pressure regulation system for trucks or trailers employing an air spring maintained at a variable pressure PAS depending upon the load on the truck or trailer, includes an air pilot pressure regulator receiving air at pressure PAS and air at the pressure of at least one tire of a truck or trailer, and configured to feed air to and bleed air from the at least one tire of the truck or trailer as a function of the load on the truck or trailer. The pressure regulator is configured to feed air to and bleed air from the at least one tire of the truck or trailer based upon the pressure of the air spring PAS as a function of the load on the air spring (FAS), and further upon the recommended pressure PT of the at least one tire as a function of the load on the tire (FT).

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
PADULA SANTO AWESTMINSTER MD

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Padula, Santo A Medina, US 7 199

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jan 27, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 27, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 27, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00