Method of manufacturing actuator

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11031883
APP PUB NO 20190103819A1
SERIAL NO

16139253

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method of manufacturing an actuator includes a first electrode layer forming step, a dielectric elastomer layer forming step, and a second electrode layer forming step, and obtains the actuator in which dielectric elastomer layers and electrode layers have been concentrically laminated. In the first electrode layer forming step, an electrode material is provided to an outer circumferential surface of a shaft section to form the electrode layer. In the dielectric elastomer layer forming step, a sheet-like or paste-like dielectric elastomer material is provided to an outer circumferential surface of the electrode layer to form the dielectric elastomer layer. In the second electrode layer forming step, the electrode material is provided to an outer circumferential surface of the dielectric elastomer layer to form the electrode layer.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HONDA MOTOR CO LTDTOKYO JAPAN TOKYO METROPOLIS

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Osada, Masahiko Wako, JP 48 779

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Dec 8, 2024
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 8, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 8, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00