Method for producing carbon nanotube web, method for producing carbon nanotube collected product, and apparatus for producing carbon nanotube web

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10899619
APP PUB NO 20190100435A1
SERIAL NO

15743128

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The method for producing a carbon nanotube web includes preparing a carbon nanotube array disposed on a substrate, the carbon nanotube array including a plurality of carbon nanotubes vertically aligned relative to the substrate; and drawing a carbon nanotube web from the carbon nanotube array so that the plurality of carbon nanotube single yarns are arranged in parallel, wherein in the step of drawing a carbon nanotube web, the carbon nanotube web is oscillated in a direction crossing both the thickness direction of the substrate and the drawing direction of the carbon nanotube web.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
YAMAHA CORPORATION10-1 NAKAZAWA-CHO CHUO-KU HAMAMATSU-SHI SHIZUOKA 430-8650
HITACHI ZOSEN CORPORATIONOSAKA-SHI

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Inoue, Tetsuya Osaka, JP 171 3019
Morihara, Norifumi Osaka, JP 5 9
Okumiya, Yasuro Shizuoka, JP 9 54
Suzuki, Katsunori Shizuoka, JP 152 1236
Yamashita, Tomoya Osaka, JP 33 141
Yataka, Koji Shizuoka, JP 15 67

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 26, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 26, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00