System to accelerate and decelerate aircraft for take-off and landing

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10377504
APP PUB NO 20190092494A1
SERIAL NO

16103540

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A system for controlling aircraft movement includes a platform configured to support the aircraft. The system includes a securing mechanism coupled to the platform to releasably couple the aircraft onto the platform. The system includes a conveying system coupled to the platform. The conveying system configured to, with the aircraft coupled to the platform during take-off of the aircraft, move the platform to accelerate the aircraft. The conveying system configured to, during landing of the aircraft, decelerate the aircraft. The system includes a controller coupled to the securing mechanism and to the conveying system. The controller configured to communicate with the securing mechanism and with the conveying system to control acceleration of the platform during take-off of the aircraft and deceleration of the platform during landing of the aircraft.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
THE BOEING COMPANY929 LONG BRIDGE DRIVE ARLINGTON VA 22202

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Harkness, William A Seattle, US 18 447
Hoffstadt, Brett M San Antonio, US 3 2
Meservy, Royal E St. Charles, US 3 2

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 13, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 13, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00