Smokeless safe combustion device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11002449
APP PUB NO 20190086095A1
SERIAL NO

15709625

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A combustion device includes a stove body and a flow guiding device. The stove body has first and second sides disposed oppositely and includes a wick disposed between the first and second sides. The wick is spaced from the first and second sides at first and second distances respectively. A flow guiding device includes first and second shielding members respectively connected to the first and second sides of the stove body. The wick is spaced from the first and second shielding members at third and fourth distances respectively. The third distance is greater than the first distance and the first shielding member is spaced from the first side. The fourth distance is greater than the second distance and the second shielding member is spaced from the second outer side.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
PRO-IRODA INDUSTRIES INCNO 68 32ND RD TAICHUNG INDUSTRIAL PARK SITUN DISTRICT TAICHUNG CITY

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chen, Wei-Long Taichung, TW 66 377

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Nov 11, 2024
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 11, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 11, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00