Coil spring

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11131356
APP PUB NO 20190085927A1
SERIAL NO

16093511

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

In the coil spring of the present invention, a helical space defined by a space between coils has a first end region whose space is increased as it extends towards the other side in the axial direction from a first reference point where the space is zero, a reference region whose space is set at a reference value L (L>0), and a second end region whose space becomes narrow as it extends toward the other side in the axial direction and zero at a second reference point. The first end region has a first end outer part and a first end inner end. In a case where a pitch angle of the space between coils that causes the displacement of the space between coils per turn of the helical space to be L is a reference pitch angle Pa, the pitch angle in the first end outer part is set at Pa while the pitch angle in the first end inner part is set at Pb (Pb>Pa).

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TOYOTA JIDOSHA KABUSHIKI KAISHA1 TOYOTA-CHO TOYOTA-SHI AICHI-KEN 471-8571
SUNCALL CORPORATION14 UMEZU NISHIURA-CHO UKYO-KU KYOTO-SHI KYOTO 615-8555

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kishihara, Ryuji Kyoto, JP 8 15
Okamura, Seiji Toyota, JP 26 96

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Mar 28, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 28, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 28, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00