Laser processing apparatus, control apparatus, laser processing method, and method of producing image forming apparatus

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11179803
APP PUB NO 20190061054A1
SERIAL NO

16100641

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A laser processing apparatus includes a light source, a laser head configured to emit a laser beam, a robot configured to move the laser head, and a control apparatus configured to control start and stop of generation of the laser beam and control operation of the robot. The control apparatus controls the light source to generate the laser beam when a first time has elapsed after causing the robot to start an operation of accelerating the laser head such that a movement speed of the laser head with respect to a processing target object reaches a constant target speed.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CANON KABUSHIKI KAISHA30-2 SHIMOMARUKO 3-CHOME OHTA-KU TOKYO 146-8501

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Agawa, Teppei Saitama, JP 4 15
Izuoka, Hirokazu Kawasaki, JP 14 23
Mizuno, Tomohiro Kawasaki, JP 49 241

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 May 23, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 May 23, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 23, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00