Film three-dimensional mesh fabric and its manufacturing method

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10618347
APP PUB NO 20190054763A1
SERIAL NO

15706491

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method of manufacturing a film three-dimensional mesh fabric has steps of preparing a base cloth, preparing a mesh fabric, preparing a hot-melt film, providing the mesh fabric on the base cloth, providing the hot-melt film on the mesh fabric, heating, compressing and sagging a part of the hot-melt film into a plurality of grids and attaching the part to the base cloth so as to form a sagged portion and a plurality of insert holes, tearing off the base cloth, removing the sagged portion, and generating the film three-dimensional mesh fabric having the mesh fabric, a remaining part of the hot-melt film attached to the mesh fabric without sagging into the plurality of grids and without being attached to the base cloth and the plurality of insert holes corresponding to the plurality of grids and formed on the hot-melt film.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
GIANT KNITTING CO LTDNO 92 YONGCHANG ST XITUN DIST TAICHUNG CITY 407

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chi, Ya-Ling Taichung, TW 11 38

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 14, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 14, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00