Connection assisting member and circuit board assembly

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10630004
APP PUB NO 20190027842A1
SERIAL NO

16034937

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A connection assisting member, for connecting a first circuit board having one or more through-holes each of which has a first contact portion formed on an inner surface thereof and a second circuit board having one or more bendable second contact portions, includes a base plate, and one or more projections projecting on a surface of the base plate and having elasticity, when fitted in a corresponding through-hole of the first circuit board as catching a corresponding second contact portion of the second circuit board, each of the one or more projections elastically presses the corresponding second contact portion of the second circuit board against the inner surface of the corresponding through-hole to electrically connect the first contact portion and the corresponding second contact portion to each other.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
JAPAN AVIATION ELECTRONICS INDUSTRY LIMITEDNO 21-2 DOGENZAKA 1-CHOME SHIBUYA-KU TOKYO 150-0043

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hashiguchi, Osamu Tokyo, JP 205 1396

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 21, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 21, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00