System and method for hoist with integrated drum and motor

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10870562
APP PUB NO 20190016571A1
SERIAL NO

15873597

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Embodiments herein relate to a permanent magnet (PM) motor driven hoist system. The hoist system includes a PM out-runner motor with a stator on a fixed central shaft with stator coils, and an outer rotor assembly coaxial with and rotatable about the stator. The rotor having a rotating housing with an outer surface radially outward of the shaft and an inner surface radially inward of the shaft and plurality of PMs disposed at the inner surface configured to magnetically couple with the stator. The rotating housing coupled to the cable drum such that rotation of the rotor assembly causes rotation of the cable drum. The system also includes a controller connected to a power source and the motor, configured to generate excitation signals applied to the stator coils to induce a torque in the outer rotor assembly and cause it to rotate about the stator and central shaft.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HORNET ACQUISITIONCO LLC13915 NW 3RD COURT VANCOUVER WA 98685

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Das, Subhra Kanti Bangalore, IN 7 26
Sivaramasastry, Adishesha Chinknyakanhalli Karnataka, IN 9 28
Thirunarayana, Ashok Kumar Karnataka, IN 6 13

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 22, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 22, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00