Optical probe system and method

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10761151
APP PUB NO 20190011507A1
SERIAL NO

15753847

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An optical fiber-mounted field sensor for measuring an electric or magnetic field includes an optical fiber configured to receive light from a laser source, a polarizer, a polarization manipulator, electro-optical material or magneto-optical material adjacent to the polarization manipulator, and a high reflection coating. The polarizer is adjacent to an output of the fiber, while the polarization manipulator is adjacent to the polarizer and opposite of the optical fiber. The electro-optical material or magneto-optical material is adjacent to the polarization manipulator, and the high reflection coating is adjacent to the electro-optical material or magneto-optical material. An optical mainframe for sending and receiving optical beams to and from the optical fiber-mounted field sensor is also described.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ADVANCED FIBER SENSORS INC2865 WINDSIDE COURT ANN ARBOR MI 48103

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Whitaker, John Dexter, US 9 94
Yang, Kyoung Ann Arbor, US 3 12

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 1, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 1, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00