Stretcher for a frame

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10919336
APP PUB NO 20190001740A1
SERIAL NO

15735899

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention relates to a device for separating first and second abutting frame sections of an assembled canvas frame. The device comprises first (1) and second (2) plate members, wherein the first plate member (1) is adapted for insertion into a groove in the first frame section of the assembled frame, and the second plate member (2) is adapted for insertion into a groove in the second frame section of the assembled frame. The first and second plate members (1, 2) are interconnected and the first plate member (1) is moveable in relation to the second plate member (2). Movement of the first plate member (1) results in separation of the frame sections. The present invention further comprises a method for separating first and second abutting frame sections.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
COLART INTERNATIONAL HOLDINGS LTD21 EVESHAM STREET THE STUDIO BUILDING LONDON W11 4AJ

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Curtis, Keith Dorset, GB 42 790
Jones, Phil Derbyshire, GB 8 80

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 16, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 16, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00