Method for recovering ethylbenzene from alkylation product of fluidized catalytic cracking off-gas and benzene

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10654768
APP PUB NO 20180362417A1
SERIAL NO

15997143

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present disclosure provides a process for effectively separating and removing by-products (light gas, C5-C6 hydrocarbon oil fraction, polyethylbenzene) contained in a substantial amount in addition to ethylbenzene as a target compound in an alkylation reaction product of a fluidized catalytic cracking off-gas to prepare ethylbenzene having high purity, and process economical efficiency may be secured by utilizing the polyethylbenzene as an absorbent or gasoline fraction, without requiring a transalkylation reaction for further producing ethylbenzene from polyethylbenzene.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SK GEO CENTRIC CO LTD(SEORIN-DONG) 26 JONG-RO JONGNO-GU SEOUL 03188

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kim, Yeon Ho Daejeon, KR 95 426
Lee, Hee Du Daejeon, KR 2 4
Lee, Ji Hoon Daejeon, KR 152 1420
Lee, Sang Il Daejeon, KR 67 664
Oh, Kyung Jong Daejeon, KR 4 39
Song, Dae Sung Daejeon, KR 5 2

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 19, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 19, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00