Ignition system for light-duty combustion engine

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10626839
APP PUB NO 20180328333A1
SERIAL NO

16045803

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An ignition system for a light-duty combustion engine includes a charge winding, a microcontroller and a power supply sub-circuit. The sub-circuit is coupled to both the charge winding and the microcontroller and includes a first power supply switch, a power supply capacitor and a power supply zener. The sub-circuit is arranged to turn off the first power supply switch so that charging of the power supply capacitor stops when the charge on the power supply capacitor exceeds the breakdown voltage on the power supply zener. In at least some implementations, the power supply capacitor may power the microcontroller and the power supply sub-circuit may limit or reduce the amount of electrical energy taken from the induced AC voltage of the charge winding to a level that is still able to sufficiently power the microcontroller yet saves energy for use elsewhere in the system.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
WALBRO LLC2015 W RIVER ROAD SUITE 202 TUCSON AS 85704

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Andersson, Martin N Caro, US 36 241
Healy, Cyrus M Ubly, US 23 99

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 21, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 21, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00