Belt transportation system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10647513
APP PUB NO 20180319597A1
SERIAL NO

15745316

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A conveyor belt (10) of closed-path type comprising a plurality of transport plates (50), defining a transport surface for the material in a forward run of the conveyor belt itself, which plates are arranged in sequence along a longitudinal transport direction (L), wherein each plate bears a first (55) and a second (56) longitudinal end portion thereat, in said forward run, it is respectively superimposed on an adjacent plate arranged upstream of the sequence with respect to the longitudinal transport direction and placed under an adjacent plate arranged downstream in such sequence, or vice versa; and an annular structure (51) for connecting said plates being arranged, in said forward run, below said plates, wherein at least one of said plates, at said first or second longitudinal portion of superimposing or placing under an adjacent plate, has a cross section with thickness (s) decreased with respect to a remaining portion of the plate itself.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MAGALDI INDUSTRIE S R LPIAZZA DI PIETRA 26 ROMA 00186

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Casillo, Domenico Buccino, IT 2 0
Magaldi, Mario Salerno, IT 37 177

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 12, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 12, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00