Integrated power generation and compression train, and method

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10815882
APP PUB NO 20180306109A1
SERIAL NO

15768187

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Disclosed herein is an integrated power generation and load driving system, comprising in combination a multi-shaft gas turbine engine comprising a high-pressure turbine mechanically coupled to an air compressor; and a low-pressure turbine, fluidly coupled to but mechanically separated from the high-pressure turbine and mechanically coupled to an output power shaft wherein the output power shaft is connected to a shaft line an electric generator, mechanically coupled to the shaft line and driven into rotation by the gas turbine engine a rotating load, mechanically coupled to the shaft line and driven into rotation by the gas turbine engine a load control arrangement, configured for controlling at least one operating parameter of the rotating load to adapt the operating condition of the rotating load to process requirements from a process, whereof the rotating load forms part, while the low-pressure turbine and the electric generator rotate at a substantially constant speed.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NUOVO PIGNONE TECNOLOGIE SRLVIA FELICE MATTEUCCI 2 FLORENCE 50127

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bianchi, Paolo Florence, IT 8 28
Iurisci, Giuseppe Florence, IT 21 58
Marcucci, Daniele Florence, IT 11 114
Milani, Giuliano Florence, IT 6 35

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 27, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 27, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00